- It is estimated that the price of stainless steel seamless pipe will still fluctuate and become stronger in March
- Accelerated de-stocking and strong cost-side support drive the operating sentiment of 2205 stainless steel seamless pipe merchants
- Stainless steel pipe is mainly used to meet the needs of replenishment two days before the terminal
- Double-clamped stainless steel pipe fittings
- The price of sanitary stainless steel pipe is mainly flexible and the short-term market is still weak
- In the near future, the downstream demand continues to recover, and the enthusiasm of stainless steel seamless pipe plant is still strong
- The cost-side support is relatively strong, and the overall operating atmosphere of the stainless steel pipe market is optimistic
- The spot market price of sanitary stainless steel tubes continues to rise under the expectation of a variety of policies
- What is the specific density of 2507 duplex stainless steel pipe? What is the calculation method?
- Chemical composition and performance characteristics of 2507 stainless steel seamless pipe
- In March, the 904L stainless steel pipe market is expected to accelerate the return of demand
- The fundamental contradiction of 2205 stainless steel pipe weakened as expected to strengthen again
- The operating sentiment of the spot market of stainless steel tubes is depressed. In the short term, the price is in the post-rising callback stage
- In the short term, pay attention to the pressure rhythm near the front height of sanitary seamless pipe and the policy risk of iron ore
- The capacity release of stainless steel plants significantly increased iron ore prices, showing a strong trend of volatility
- Where will the market go after the spot transaction of 304L stainless steel pipe weakens?
- The cost side pressure of stainless steel welded pipe enterprises is still high
- The global crude steel output in January was 145.3 million tons, down 3.3% year on year
- Op die oomblik, the contradiction in the stainless steel seamless pipe market is still that the expectation is too fast and the reality is too slow
- The supply and demand space for stainless steel welded pipe will be further released as the weather warms up and work resumes